Project Brief

Kasenyi Port Infrastructure Upgrade

Implementation Partners

--

Implementation Period

2017 - 2021

Project Participants

--

Project Value

$972,000
Kasenyi Port Infrastructure Upgrade

Project Rationale

Kasenyi Port, on the DRC side of Lake Albert,  juxtaposes the Port of Ntoroko on the Uganda side. Lake Albert provides a trading  route across water to the city of Bunia and the hinterland, until Kisangani. The project aims to rehabilitate the infrastructure at the Port.  The jetty will be renovated, with the first 112 metres requiring a small amount of refurbishment, but the basic construction is generally considered to be sound. The top surface of this 112 metres will be paved with reinforced concrete. The old fixed crane structure and rails crane will be dismantled and removed from the site. The remaining 51 metres of the jetty will be paved to take the weight of the mobile cranes. Capstans and new rails will be installed.

NB/ If the project is above $250,000 a PAR must be submitted for approval

Project approval summary:

Responsibility Center: 22_DRC

  1. PAR approval date: June 2016
  2. PAR number: DRC CBT PAR
  3. PAR approval authority: Board