Project Brief

Mahagi OSBP Infrastructure Upgrade

Implementation Partners

--

Implementation Period

2017 - 2021

Project Participants

--

Project Value

$1,182,000
Mahagi-OSP

Project Rationale

Mahagi (DRC)/Goli (UG) is very busy border crossing located on the axis between the population centres of Arua (UG) and Bunia (DRC) as well as the longer corridor connecting Mombasa Port and Kisangani.  At Mahagi, this project will undertake a detailed design and prepare tender documents for a juxtaposed One Stop Border Post facility comprising of roads, parking, warehouses on DRC side and the rehabilitation and modification of existing buildings, parking and small warehouse. The project proposes the most practical and cost-effective way to bring power to the DRC side of the border.

NB/ If the project is above $250,000 a PAR must be submitted for approval

Project Approval Summary:

Responsibility Center: 22_DRC

  1. PAR approval date: June 2016
  2. PAR number: DRC CBT PAR
  3. PAR approval authority: Board