Desired Results:
Reduced Transit time and cost from Dar Port to Kigali or Bujumbura
Traffic along the central corridor is stopped for about 55 times before reaching the destination (8 weighbridges,44 Police checks and 3 revenue checks) and this cause a significant delays and relatively high transportation cost.
Establishment of One stop inspection stations (OSIS) along the central corridor, specifically at Manyoni and Nyakanazi aiming at reducing transit cost and facilitate trade. The stations will house all transport regulatory agencies in the transport sub-sector (TRA, Police, TANROADS, and standards regulatory bodies) in the view to conducting their respective regulatory roles once at every station, at a time.
One Stop Inspection Station is being constructed at  Manyoni and Nyakanazi.
Key Outputs:
Reduction of transit time
TMA is providing fund for Feasibility study, design work and supervison of construction works.
Email: Israel Sekirasa  Israel.Sekirasa@trademarkea.com
Reduced Transit time and cost from Dar Port to Kigali or Bujumbura